Cactus II Pipeline
Product · Industrial equipment by Plains GP Holdings
High-capacity crude oil transportation from the Permian Basin to the Texas Gulf Coast.
A major crude oil pipeline system connecting the Permian Basin to the Texas Gulf Coast with a capacity of 670,000 barrels per day. It provides energy producers with long-haul takeaway to Corpus Christi export outlets.
Category: Oil & Gas Services
- Capacity
- 670,000 barrels per day
- Performance
- 670,000 bpd throughput capacity
- Daily Capacity
- 670,000 barrels per day
- Origin Point
- Wink, Texas area
- Destination Point
- Corpus Christi, Texas
- Primary Commodity
- Crude Oil
- 670,000 barrels per day capacity
- Connects Permian Basin to Texas Gulf Coast
- Originates in Wink, Texas area
- Delivers to Corpus Christi, Texas market
Overview
Cactus II Pipeline is a major crude oil transportation system operated by Plains All American Pipeline that connects the Permian Basin to the Texas Gulf Coast. The pipeline provides energy producers with a reliable long-haul takeaway solution, capable of moving 670,000 barrels of crude oil per day from the Wink, Texas area to Corpus Christi. As a critical piece of midstream infrastructure, it helps balance energy supply and demand by delivering Permian crude to major market hubs and export outlets. The system serves businesses in the energy sector by offering efficient, large-scale transportation services for crude oil logistics. It is part of Plains' extensive network of pipeline transportation and gathering assets in key North American producing basins.
Transportation and Logistics
- Permian Basin Takeaway: The pipeline system provides long-haul takeaway capacity for energy producers operating in the Permian Basin.
- Gulf Coast Connectivity: The infrastructure connects the Wink, Texas area to major market hubs and export outlets on the Texas Gulf Coast.
- Corpus Christi Delivery: The system delivers crude oil to the Corpus Christi, Texas market, providing access to regional refineries and export terminals.
Operational Performance
- 670,000 bpd Capacity: The pipeline system is designed to transport up to 670,000 barrels of crude oil per day.
- Midstream Infrastructure: The system operates as a large-scale crude oil transportation solution for the midstream energy sector.
Use cases
- Energy producers in the Permian Basin use the pipeline to transport crude oil to Gulf Coast market hubs.
- Midstream logistics providers utilize the 670,000 bpd capacity to move large volumes of oil to Corpus Christi export outlets.
- Refineries on the Texas Gulf Coast receive crude oil deliveries through the system for processing and distribution.
Specifications
- Capacity
- 670,000 barrels per day
- Performance
- 670,000 bpd throughput capacity
- Daily Capacity
- 670,000 barrels per day
- Origin Point
- Wink, Texas area
- Destination Point
- Corpus Christi, Texas
- Primary Commodity
- Crude Oil
Added by AntSpace from public sources (plains.com).