Fluidstack Custom Data Centers
Product · Industrial equipment by Fluidstack
Civilization-scale infrastructure for frontier AI.
Large-scale, purpose-built AI infrastructure for frontier labs, featuring 1.5GW capacity campuses and rapid six-month construction timelines. Designed for high-reliability XPU operations with closed-loop cooling and independent power.
- Languages
- English
Category: Data Centers
- Capacity
- Up to 1.5 GW per campus phase
- Performance
- 250MW data centers built in six months from breaking ground
- Phase 1 Capacity (Texas)
- 1.5 GW
- Phase 1 Investment (Texas)
- $4 billion
- Standard Build Unit
- 250 MW
- Construction Speed
- 6 months from breaking ground
- 1.5 GW capacity planned for Cameron County phase 1
- $4 billion investment for initial Texas campus phase
- 250MW data centers built in six months
- Closed-loop cooling with indefinite water recirculation
- 60 decibel operational sound limit at property line
Overview
These facilities are engineered from first principles to support the massive compute and power requirements of frontier AI training and deployment. The company manages the entire lifecycle, from onshore manufacturing of components to operating tens of millions of XPUs. Each campus is designed to be self-sufficient, utilizing closed-loop cooling systems and developing off-grid solar power to minimize community impact.
Infrastructure Engineering
- Rapid Construction: Fluidstack builds 250MW data centers in as little as six months from breaking ground.
- First-Principles Design: The company designs compute and power infrastructure from first principles to scale to hundreds of gigawatts.
- Onshore Manufacturing: Fluidstack utilizes onshore manufacturing for all compute and power infrastructure components.
- XPU Operations: Facilities are designed to operate tens of millions of XPUs with high reliability.
Sustainability and Community
- Closed-Loop Cooling: Cooling systems recirculate water indefinitely in a closed loop, requiring top-ups only for maintenance.
- Solar Integration: The company develops off-grid solar to power compute infrastructure as it scales.
- Noise Mitigation: Sound at the property line is limited to 60 decibels, comparable to a normal conversation.
- Resource Independence: Fluidstack pays for its own energy, infrastructure, and water without passing costs to the community.
Use cases
- AI labs deploy frontier models on massive compute clusters built in record time.
- Governments and enterprises secure strategic national compute capacity through custom-built U.S. data centers.
- Infrastructure teams scale to hundreds of gigawatts of compute using first-principles power and cooling designs.
Specifications
- Capacity
- Up to 1.5 GW per campus phase
- Performance
- 250MW data centers built in six months from breaking ground
- Power
- Self-funded energy infrastructure including off-grid solar development
- Operating conditions
- 60 decibel sound limit at property line; closed-loop water recirculation
- Phase 1 Capacity (Texas)
- 1.5 GW
- Phase 1 Investment (Texas)
- $4 billion
- Standard Build Unit
- 250 MW
- Construction Speed
- 6 months from breaking ground
- Operational Sound Limit
- 60 decibels at property line
- Cooling System Type
- Closed-loop water recirculation
- Water Tank Size
- Less than one Olympic-sized swimming pool
- Manufacturing Location
- Onshore (USA)
How it works
- First-Principles Design: Fluidstack designs the compute and power infrastructure from first principles to meet frontier AI requirements.
- Rapid Deployment: The company breaks ground on large-scale campuses, such as the 1.5GW site in Texas, aiming for rapid delivery.
- Reliable Operations: Fluidstack manages the ongoing operation of tens of millions of XPUs with high reliability for AI labs.
FAQ
How fast can Fluidstack build a data center?
Fluidstack can build a 250MW data center in six months from breaking ground.
How does the cooling system work?
The company uses a closed-loop cooling system where water recirculates indefinitely, requiring only occasional top-ups for maintenance.
Does the infrastructure impact local utility costs?
Fluidstack pays for its own energy, infrastructure, and water, requesting no local property tax abatements or county incentives.
What power sources does Fluidstack use?
The company is developing off-grid solar to power its compute infrastructure as it scales toward hundreds of gigawatts.
Added by AntSpace from public sources (fluidstack.io).