Rider 18 Distributed Generation Program

Product by DTE Energy

Connect your private renewable energy system to the DTE grid and save.

A grid interconnection program for DTE customers to link private solar, wind, or hydro systems to the utility network and earn bill credits for excess energy.

Category: Solar Energy

Platforms
Web (PowerClerk portal)
How to get it
Online application via the DTE PowerClerk portal
Maximum System Capacity
550 kW
Typical Residential System Size
7 kW
Typical Commercial System Size
49 kW
Eligible Project Levels
Level 1, 2, and 3
  • Connects private solar, wind, or hydro systems to the DTE grid
  • Supports renewable projects up to 550 kW in capacity
  • Provides outflow credits to offset monthly electricity costs
  • Online application and project tracking via PowerClerk portal

Overview

Rider 18 Distributed Generation Program is DTE Energy's framework for connecting customer-owned renewable energy systems to the utility grid. It serves both residential and business customers who install private generation equipment such as rooftop solar, wind turbines, or hydroelectric systems. The program allows participants to remain connected to the distribution grid while receiving compensation for excess electricity they send back to DTE. These "outflow credits" are applied to the customer's bill to offset the cost of energy consumed from the grid during periods when their private system is not generating sufficient power. The program accommodates systems with a capacity of up to 550 kW, with typical residential installations averaging 7 kW. DTE manages the interconnection process and billing infrastructure, while physical installation is handled by third-party contractors.

Grid Integration and Billing

  • Grid Interconnection: The program allows residential and business customers to connect private renewable energy systems, such as solar, wind, or hydroelectric, to the DTE distribution grid.
  • Outflow Compensation: Participants receive compensation for electricity they send into DTE's distribution system, which is used to offset the cost of energy they consume from the grid.
  • 550 kW Capacity Limit: The program is compatible with renewable energy systems up to a maximum capacity of 550 kW.
  • Financial Impact Calculator: Customers can use a Distributed Generation Impact Calculator to estimate the financial effects of installing a solar PV system based on their usage data.

Eligibility and Requirements

  • Renewable Resource Support: The program supports various renewable resources including rooftop solar, wind, and hydroelectric power generation.
  • Project Level Eligibility: Participation is limited to Level 1, 2, and 3 renewable projects as defined by DTE's requirements.
  • Consumption-Based Sizing: System sizing is determined based on the most recent 12-month kWh consumption at the customer's premise.
  • Digital Application Management: DTE provides a dedicated PowerClerk portal for customers to start applications and track the status of their interconnection projects.

Use cases

  • Homeowners install rooftop solar panels to reduce their monthly DTE electricity bills through outflow credits.
  • Business owners connect large-scale wind or solar arrays up to 550 kW to the distribution grid for energy compensation.
  • Residential customers use the Distributed Generation Impact Calculator to estimate potential savings before investing in solar equipment.

Specifications

Platforms
Web (PowerClerk portal)
How to get it
Online application via the DTE PowerClerk portal
Maximum System Capacity
550 kW
Typical Residential System Size
7 kW
Typical Commercial System Size
49 kW
Eligible Project Levels
Level 1, 2, and 3
Supported Resources
Solar, Wind, Hydroelectric
Sizing Basis
12-month kWh consumption history

How it works

  1. Site Evaluation and Installation: The customer works with a third-party installer to evaluate their site for factors like sunlight, shade, and roof condition.
  2. Application Submission: The customer or their installer submits an interconnection application through DTE's online portal to meet renewable resource requirements.
  3. Technical Review: DTE reviews the application for Level 1, 2, or 3 project eligibility and system sizing based on 12-month usage history.
  4. Grid Connection and Billing: Once approved and connected, excess energy flows to the grid, and the customer receives monthly outflow credits on their bill.

FAQ

What is the maximum system size allowed?

The program is compatible with systems up to 550 kW. Typical residential systems are approximately 7 kW, while commercial systems average around 49 kW.

How does the billing credit work?

Participants receive an 'outflow credit' on their bill for excess energy sent to the grid. This credit offsets the cost of electricity used from DTE when the private system is not producing enough power.

What types of energy generation are supported?

While rooftop solar is most common, the program also supports wind and hydroelectric power generation systems.

Does DTE install the solar panels?

DTE does not install the systems; customers must work with third-party installers to evaluate their property and perform the physical installation.

Added by AntSpace from public sources (advantage.dteenergy.com).

Related

More products by DTE Energy